    Sl. No Name of Project & Capacity (CKm) Remark

    Transmission

    1 220 KV D/C Vyasi to Dehradun T/L (71 CKm) Section of Vyasi – Dehradun Line (71 Ckm) completed in the M/o March, 2022 & Energized on dated 13.04.2022 for evacuation of Vyasi HEP (120 MW ).
    Further, rest section of Vyasi – Lakhwar Line (10 Ckm) shall be extended later on as per CoD of Lakhwar HEP (300 MW).
    Sl. No Name of Project Capacity Date of Completion
    1 220 KV Double Circuit Rudrapur (Brahamwari) – Srinagar Line 150 Ckm 02.06.2020
    2 132 KV SC Ranikhet Bageshwar line at DC tower 43.06 Ckm 21.11.2019
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 132 KV Srinagar- Simli Line and LILO at 132 KV S/s Srinagar 132 KV 64.45 CKm 28.04.2016
    2 400 KV Srinagar-Srinagar PH Line 400 KV 29 CKm 25.07.2016
    3 220 KV D/C Twin Zebra line from 400 KV S/s PGCIL, Dehradun to 220 KV S/s PTCUL, Dehradun 220 KV 12.3 CKm 13.01.2017
    4 LILO of 132 KV Dhalipur –Purkul Line at 220 KV S/s Dehradun 132/220 KV 5.3 CKm 04.02.2017
    4 LILO of 220 kV Rishikesh-Jhajhra line at 220 kV S/s IIP, Harrawala 220 KV 0.14 CKm 04.08.2018
    4 LILO of 220 kV D/C Puhana-SIDCUL line at 220 KV S/s Piran Kaliyar 220 KV 10.86 Ckm 23.09.2018
    Total Line Length in Circuit Kms. Added 122.05
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 220 KV Berheni – Pantnagar line IInd Circuit 220 KV S/C 35.26 ACSR Zebra 31.01.2013
    2 220 KV D/C line from 400 KV S/s Kashipur to 220 KV S/s Mahuakheraganj 220 KV D/C 33.40 ACSR Zebra 10.05.2014
    3 LILO of 132 KV Sitarganj – Kiccha Line 132KV S/C 30.00 ACSR Panther 09.10.2012
    4 LILO of 132 KV Almora Pithoragarh line at 220 KV S/s Pithoragarh (PGCIL) 132KV S/C 16.8 ACSR Panther 30.10.2013
    Total Line Length in Circuit Kms. Added 115.46
    Gross Line Length in Circuit Kms. as on 31.05.2014 1131.858

     

    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 LILO of 220 KV Khodri-Rishikesh line at 220 KV S/s Dehradun 220 KV D/C 4.60 ACSR Zebra 30.01.2014
    2 132 KV Satpuli-Srinagar Line 132KV D/C 104.80 ACSR Panther 25.02.2013
    Total Line Length in Circuit Kms. Added 109.40
    Gross Line Length in Circuit Kms. as on 31.05.2014 1882.878

     

    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 LILO OF 220 KV Rishikesh – Muzaffarnagar line at 220 KV S/s Roorkee 220 KV D/C 0.10 ACSR Zebra 11.02.2005
    2 220 KV Railway Traction (2 phase) 220 KV S/C 4.80 ACSR Zebra 15.07.2005
    3 132 KV Roorkee-Bhagwanpur 132 KV S/C 20.14 ACSR Panther 24.05.2006
    4 132 KV Bhagwanpur-Saharanpur 132KV S/C 26.62 ACSR Panther 24.05.2006
    5 132 KV Manglore – Nehtaur line 132KV S/C 73.73 ACSR Panther 26.10.2006
    6 132 KV Manglore-AIS-I line 132KV S/C 7.00 ACSR Panther 27.10.2006
    7 132 KV Manglore-AIS-II line 132KV S/C 7.00 ACSR Panther 27.11.2006
    Total Line Length in Circuit Kms. Added 139.39
    Gross Line Length in Circuit Kms. as on 01.04.2007 1494.487
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 220 KV Kashipur – Berheni line 220 KV D/C 53.60 ACSR Zebra 01.01.2011
    2 220 KV Berheni – Pantnagarline 220 KV S/C 26.57 ACSR Zebra 01.01.2011
    3 132 KV Khatima- Sitarganj 132KV D/C 24.3 ACSR Wolf 01.07.2007
    4 132 KV Kashipur- IGL 132KV S/C 2.39 ACSR Panther 21.07.2007
    5 132 KV Kashipur- KVS 132KV S/C 1.03 ACSR Panther 21.07.2007
    6 132 KV Sitarganj – Dohna 132KV S/C 105.5 ACSR Panther 25.08.2007
    7 132 KV Sitarganj – PGCIL (220 KV S/s) 132KV S/C 0.05 ACSR Panther 02.03.2009
    8 132 KV Kashipur (400 KV S/s) – Bazpur 132KV S/C on D/C Tower 15.62 ACSR Panther 28.02.2010
    9 132 KV Second Circuit Sitarganj – Kichcha line 132KV S/C 32.15 ACSR Panther 17.01.2011
    10 LILO of 132 KV Kashipur (Old)– Thakurdwara line at Mahuakheraganj 132KV D/C 13.018 ACSR Panther 24.11.2011
    Total Line Length in Circuit Kms. Added 282.918
    Gross Line Length in Circuit Kms. as on 01.04.2012 1016.398
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 220 KV Rishikesh-Dharasu- II 220KV S/C 80.40 ACSR Zebra 23.04.2009
    2 220 KV Chamba-Ghansali 220KV S/C 35.785 ACSR Zebra 30.09.2009
    3 LILO of 220 KV Roshnabad – Roorkee line at 400 KV S/s Puhana 220 KV D/C 10.00 ACSR Panther 24.11.2010
    4 220 KV Ghansali-Bhilangana line 220 KV D/C 39.00 ACSR Zebra 21.10.2011
    5 132 KV Jwalapur – SIDCUL (Haridwar) line 132KV S/C 0.12 ACSR Panther 05.06.2007
    6 LILO of 132 KV Roorkee – Nehtaur line at 132 KV S/s Laksar 132KV D/C 6.00 ACSR Panther 16.07.2007
    7 132 KV Laksar-Nehtaur line 132KV S/C 53.50 ACSR Panther 18.07.2007
    8 132 KV Laksar-RBNS Sugar Mill line 132KV S/C 4.20 ACSR Panther 01.04.2008
    9 132 KV Kotdwar – Satpuli line 132KV S/C on D/C 46.7 ACSR Panther 28.01.2010
    10 LILO of Rishikesh – Srinagar line at 132 KV S/s Srinagar line 132KV D/C 3.286 ACSR Panther Dec. 2011
    Total Line Length in Circuit Kms. Added 278.991
    Gross Line Length in Circuit Kms. as on 01.04.2012 1773.478
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 LILO of Rishikesh-Moradabad line at 400 KV S/S Kashipur (Near Dhampur) 400 KV D/C 119 ACSR Moose 11.11.2006
    2 132 KV Kashipur (400 KV S/s)– Ramnagar 132KV S/C 20.00 ACSR Panther 07.09.2005
    3 132 KV Kashipur (400 KV S/s)- Kashipur 132 KV S/s) 1st 132KV S/C 5.50 ACSR Panther 13.01.2006
    4 132 KV Kashipur (400 KV S/s) – Kashipur (132 KV S/s) IInd 132 KV S/C 6.05 ACSR Panther 13.01.2006
    5 132KV Kichha-Sitarganj 132KV S/C on D/C Tower 32.15 ACSR Panther 01.07.2006
    6 132KV Pantnagar – Rudrapur 132KV S/C 7.60 ACSR Panther 05.08.2006
    7 132 KV Kichha – Rudrapur 132KV S/C 20.31 ACSR Panther 05.08.2006
    8 132 KV Almora – Ranikhet 132KV S/C 22.66 ACSR Panther 02.12.2006
    9 132 KV Kashipur (400 KV S/s)–Jaspur 132KV D/C 20.00 ACSR Panther 24.12.2006
    Total Line Length in Circuit Kms. Added 253.27
    Gross Line Length in Circuit Kms. as on 01.04.2007 733.48
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 220 KV Pantnagar – Baikunthapur 220KV S/C 70.72 ACSR Zebra 26.07.2002
    2 220 KV Pantnagar – Kamalwaganja 220KV S/C 37.32 ACSR Zebra 26.07.2002
    3 220 KV Pantnagar – 132 KV Haldwani 132 KV S/C 39.80 ACSR Panther 26.07.2002
    4 132 KV Almora – Pithoragarh 132 KV S/C 76.40 ACSR Panther 06.02.2003
    5 132 KV Kamaluaganja – Bazpur 132 KV S/C 44.24 ACSR Panther 26.07.2003
    6 132 KV Kamaluaganja -Haldwani 132KV S/C on D/C Tower 8.40 ACSR Panther 26.07.2003
    Total Line Length in Ckt. Kms. Added 276.88
    Line Length in Ckt. Kms. as on 01.06.2004 480.21
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 132 KV Jwalapur-Bhupatwala 132KV S/C 10.27 ACSR Panther 02.12.2003
    2 132 KV Chilla-BPT – Rishikesh 132KV S/C 53.13 ACSR Panther 02.12.2003
    Total Line Length in Circuit Kms. Added 63.40
    Gross Line Length in Circuit Kms. as on 01.06.2004 1355.097
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 400 KV Rishikesh – Moradabad Line 400KV S/C 157 Moose 1983
    2 400 KV Rishikesh – Puhana(PGCIL) Muzaffarnagar 400 KV S/C 112 Moose 31.03.1984
    3 220 KV Chhibro- Khodri I Ckt. 220KV S/C 5.771 Deer 1973
    4 220 KV Chhibro- Khodri II Ckt. 220KV S/C 8.596 Deer 1975
    5 220 KV Khodri-Rishikesh 220KV S/C 79.63 Deer March 1976
    6 220 KV Rishikesh-SIDCUL( Haridwar) 220KV S/C 24.53 ACSR- Deer 17.09.1979
    7 220 KV Rishikesh – Chamba 220KV S/C 40.50 ACSR Zebra 31.03.1983
    8 220 KV Chamba-Dharasu 220KV S/C 38.558 ACSR Zebra 31.03.1983
    9 220 KV Dharasu-Uttarkashi-I 220KV S/C 25.00 ACSR Zebra 22.03.1986
    10 220 KV Dharasu – Uttarkashi-II 220KV S/C 24.70 ACSR Zebra 22.03.1986
    11 220 KV Rishikesh- Dharasu-I 220KV S/C 79.958 ACSR Zebra 22.03.1986
    12 220 KV Haridwar-Puhana 220 KV S/C 23.31 ACSR-Deer 17.09.1979
    13 220 KV Puhana-Roorkee 220 KV S/C 16.00 ACSR-Deer 17.09.1979
    14 66 KV Roorkee-Pathri-I 66KV S/C 20.68 ACSR-Dog 1956
    15 66 KV Roorkee-Pathri-II 66KV S/C 20.68 ACSR-Dog 1956
    16 132 KV Roorkee-Saharanpur 132KV S/C 30.72 ACSR Panther 1958
    17 132 KV Roorkee-Manglore 132KV S/C 13.89 ACSR-Wolf 1959
    18 132 KV Roorkee-Laksar 132 KV S/C 26.50 ACSR-Wolf 1959
    19 132 KV Rishikesh-Majra 132KV S/C 41.14 ACSR Panther 22.08.1966
    20 132 KV Dhalipur-Dhakrani 132KV S/C 6.60 ACSR Panther 1966
    21 132 KV Khodri – Dhakrani 132KV S/C 22.77 ACSR Panther 30.04.1972
    22 132 KV Dhalipur-Kulhal 132KV S/C 44.61 ACSR Panther 30.04.1972
    23 132 KV Jwalapur-Chilla 132KV D/C 16.89 ACSR Panther 12.08.1973
    24 132 KV Majra-Kulhal-II 132KV S/C 44.29 ACSR Panther 16.04.1976
    25 132 KV Roorkee-Jwalapur 132KV S/C 26.57 ACSR Panther 07.12.1978
    26 132 KV Jwalapur-Rishikesh 132KV S/C 22.97 ACSR Panther 09.01.1979
    27 132 KV RoorkeeSIDCUL(Haridwar) 132KV S/C 31.15 ACSR Panther 17.09.1979
    28 132 KV Rishikesh-Srinagar 132KV S/C 78.00 ACSR Panther 30.06.1980
    29 132 KV Majra-Purkul 132KV S/C 22.77 ACSR Panther 27.03.1983
    30 132 KV Rishikesh-Bindal 132KV S/C 44.73 ACSR Panther 31.03.1983
    31 132 KV Majra-Kulhal-I 132KV S/C 41.77 ACSR Panther 31.03.1983
    32 132 KV Dhalipur-Purkul 132KV S/C 13.96 ACSR Panther 03.03.1984
    33 132 KV Bindal-Majra 132KV S/C 8.54 ACSR Panther 31.03.1992
    34 132 KV Chilla-Nazibabad 132KV S/C 53.134 ACSR Panther 16.06.1995
    35 132 KV Najibabad-Kotdwar 132KV S/C 23.78 ACSR Panther 16.06.1995
    Total Line Length in Circuit Kms. as on 01.04.2001 1291.697
    S.No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning
    1 132 KV Ramnagar – Kalagarh 132KV S/C 69.4 ACSR Panther 21.09.1978
    2 132 KV Jaspur – Kalagarh 132KV S/C 32.74 ACSR Panther 21.09.1978
    3 132 KV Kashipur – Thakurdwara line 132KV S/C 14.3 ACSR Panther 21.09.1978
    4 132 KV Haldwani – Bhowali 132KV S/C 14.06 ACSR Panther 01.12.1978
    5 132 KV Bhowali – Almora 132 KV S/C 31.04 ACSR Panther 17.11.1979
    6 132 KV Kashipur – Bazpur 132 KV S/C 15.62 ACSR- Panther 31.12.1988
    7 132 KV Kichha – Richha 132 KV S/C 7.60 ACSR Panther 30.03.1993
    8 132 KV Kichha – CPP 132 KV S/C 18.57 ACSR Panther 30.03.1993
    Total Line Length in Ckt. Kms. as on 01.04.2001 203.33